- Car wash permission
  - Calculation of  con-
    struction expenses
  - Investment profit &
    loss and Operating
    profit & loss of Car
   wash
  - Management of      wastewater treatment      facility
  - Equipment standard
  - Field construction       pictures
  - What is car-tent?
 
 
¢Ñ Car-wash permission [Operation commencement report of wastewater treatment & prevention facility] [Operation log of disposal & preventionn facility]
¡á Area classification for permission
 
(1) Approval of wastewater disposal facility installation
  ¨ç Car-wash business permission areas: quasi-residential area, commercial area, industrial area, parking district area
¨è Areas of possible modification: forests & fields, empty land
¨é Areas not permitting car-wash business: Exclusive residential area, industrial complex area (planned location), forest preservation area, class 1 & 2 aesthetic areas, scenic area, development restriction area
(2) Permitted area (Construction Law & Ordinance)
  ¨ç Standard of permission for each area
¨è Standard of permission for each district (Refer to table 1)
* Permission can be made for Green Belt areas. (Exception: Quasi-agricultural/forestry areas are excluded because the change of use is not permitted.)
   
<Table 1> Construction Law & Ordinance
¨ç Standard of permission for each area
Residential area
Commercial area
Industrial area
Green area
Exclusive General Quasi Central General Vicinity Exclusive General Quasi Preservation Production Natural
x ¡ã ¡Û ¡Û ¡Û ¡Û x ¡Û ¡Û x x x

¨è Standard of permission for each district
Scenic Parking Arrangement Aesthetic 1 Aesthetic
2
Aesthetic
3
Aesthetic
4
Aesthetic
5
Apartment
x ¡Û ¡Û x x ¡â ¡â ¡â x
¡Û Permission possible, x Permission impossible, ¡ã Conditionally possible (Site which has contact of more than 10 m with 20 m wide road), ¡â Conditionally possible (Construction aesthetic deliberation)
 
¡á How to report (permit) disposal facility
 
(1) Disposal facility installation report (permission) form (Refer to Figure 1)
(2) Annotation to the form: Upon the application for the installation of wastewater disposal facility, facility for the disposal of more than 50 tons/day and facility to be installed in the area whose classification is over clean area come under permission and the other cases come under report. Process takes 10 business days.
  ¨ç Name of business: It the business has existed, the name registered on business registration should be entered. It the business is new, a name should be given to the business to be entered.
¨è Name of representative: The name of business owner should be entered.
¨é Resident registration number: Resident registration number of business owner should be entered.
¨ê Address: Current address & telephone number of business owner shown on his/her resident registration should be entered.
¨ë Business location: The address & telephone of the business or application location should be entered.
¨ì Type of business: The type of current business should be entered. Those except for gasoline station, taxi and bus should be entered as car-wash business.
¨í Major products: Can be omitted.
¨î Expected date of installation commencement: Expected date that the installation of wastewater disposal & treatment facility will commence.
¨ï Expected date of operation commencement: Expected date that the disposal facility will commence operation.
¨ð Wastewater disposal & prevention facility
¢º Name of disposal facility: Car-wash
¢º Production capacity (units/day): Daily maximum & average number of car-washing
¢º Amount of wastewater disposal (§©/day): Daily maximum & average wastewater disposal amount
¢º Wastewater treatment method & capacity: Physical & chemicals treatment method and the maximum wastewater-treatment capacity of the facility
¨ñ Operation hours & annual operation days of disposal facility
¢º Operation hours & annual operation days should be entered.
¢º Operation hours & annual operation days of prevention facility.


* Clause 1, Article 10 of Water Quality Environment Protection Law
Presidential decree requires that the one who wants to install disposal facility should get permission from or report to the Minister of Environment.

¢º Clear statement of document filing date, the name of applicant¡¯s (reporter¡¯s) representative and competent authority

* Required documents

(1) Map showing the location of the disposal facility & wastewater disposal process flow and plane figure of the business are required. The arrangement of disposal facility & prevention facility should be shown with the flow expressed with arrow marks and the title of the facilities of each process stated. And, the location of water flow meter, wastewater treatment facility flow meter & sample-collection and the connection pipe between water and drain should be indicated.

(2) Detailed statement of material (including water) consumption & product output and estimate statement of pollutant generation are required. Water, detergent and wax are included in material. Detailed consumption should be stated in terms of day, month and year. Product output means the number of car-washing.

  ¢º Estimate statement of pollutant generation
  PH: 6~8, COD: 203§·/§¤, SS: 188§·/§¤, NH (mineral oil): 21.6§·/§¤, ABS: 3§·/§¤


(3) Pollutant treatment plan
Made with reference to the above-stated flow sheet, treatment plan should accompany a drawing. It does not come under the exemption from the installation of prevention facility and the item of related documents does not exist.

(4) Other documents required by the authorities concerned
Written permission of construction, Land use plan, Copy of lease contract or building (land) use permission if it is to be leased, Copy of business permission if it is an addition to the existing business
 
¡á Particulars of other documents
 
(1) Disposal facility installation permission/report details
  Name of disposal facility: 140. For transportation equipment repair & car-washing facility and automatic car-washer, the area of automatic car-wash, general car-wash or the bay of roofless self car-wash expressed in §³. The number of automatic car-washer. If it is general car-wash, enter 1. (Refer to Table 2)
<Ç¥2> ¹æÁö½Ã¼³ ¼³Ä¡³»¿ª(ȸºÐ½Ä)
¹æÁö½Ã¼³
¹æÁö½Ã¼³¸í ¿ë·®(§©) ¼ö·®
¡Û ¼öÁú¿À?m¹æÁö½Ã¼³¸í-¹°¸®, È­ÇÐÀû 󸮽ü³
ħ»çÁ¶ 0.5 1
À¯¼öºÐ¸®½Ã¼³ 3 1
À¯·®Á¶Á¤½Ã¼³(Áý¼öÁ¶) 12 1
ÀÀÁýħÀü½Ã¼³ 4.13 1
¿©°ú½Ã¼³ 0.36 1
Å»¼ö½Ã¼³ 0.07 4
(2) Æó¼ö¹èÃâ·® »êÃâ±Ù°Å
  ¼¼Â÷¹æ½Ä : ÀÚµ¿¼¼Â÷±â, ¼Õ¼ö, ÀÏ¹Ý ¹æ¹ý ¸í½Ã
Æó¼ö¹èÃâ·® ¹× »êÃâ±Ù°Å : ¿¹)ÀÏÀÏ Æò±Õ ¹èÃâ·®(ÀÚµ¿¼¼Â÷±âÀÇ °æ¿ì) 1´ë ¼¼Â÷½Ã ¼Ò¿ä¹°·® : 100§¤/´ë
Æó¼ö¹èÃâ·® »êÃâ : 100§¤/´ë x 80´ë/ÀÏ =8m3/ÀÏ
(3) Æó±â¹°¹ß»ý·® »êÁ¤ ¹× 󸮹æ¹ý
  SS : ¿ø¼ö 188§·/§¤ ó¸®ÈÄ 40§·/§¤¶ó Çϸé (188-40)§·/§¤ x 10-3 x 8m3/ÀÏ = 1.184§¸/ÀÏ ¾àǰ»ç¿ë¿¡ ÀÇÇÑ Sludge¹ß»ý·®
»ç¿ë¾àǰNaoH¿Í A12(SO4)3 A12(SO4)3 + 6NaoH¡æ3Na2SO4 + 2Al(OH)3 ¡é ħÀü¹° ºÐÀÚ·® 240 : 158, NaoH»ç¿ë(70%»ç¿ë), (158/240) x 0.057§¸ x 8m3/ÀÏ = 0.3002§¸/ÀÏ »ç¿ë
NaoH»ç¿ë·® : ºÐÀÚ·® 40.70%½Ã 57G/Æó¼ö(Tom) Sludge¹ß»ý·®, ¹èÃâ½Ã 98% ÇÔ¼öÀ², (1,184 + 0.0.3002)§¸/ÀÏ x (100/(100-98)) = 74.21§¸/ÀÏ
Å»¼ö, °ÇÁ¶ÈÄ 75%·Î º¸¸é 74.21§¸/ÀÏ x ((100-98)/(100-75)) = 5.9368§¸/ÀÏ
(4) ¹èÃâÇã¿ë±âÁØ
  ¹èÃâÇã¿ë±âÁØ : Æó¼öÀÇ Ã³¸®ÈÄ ¹æ·ù¼ö ¼öÁúÀÇ Çã¿ë±âÁØÀ» ¸»ÇÑ´Ù.(Ç¥3 ÂüÁ¶)
<Ç¥3> ¹èÃâÇã¿ë±âÁØ(´ÜÀ§ : §·/§¤)
±¸ºÐ ûÁ¤Áö¿ª (°¡)Áö¿ª (³ª)Áö¿ª
Ç׸ñ
PH 5.8~8.6 5.8~8.6 5.8~8.6
COD 50 §·/§¤ÀÌÇÏ 90§·/§¤ÀÌÇÏ 130§·/§¤ÀÌÇÏ
SS 40§·/§¤ÀÌÇÏ 80§·/§¤ÀÌÇÏ 120§·/§¤ÀÌÇÏ
NH(±¤À¯·ù) 1§·/§¤ÀÌÇÏ 5§·/§¤ÀÌÇÏ 5§·/§¤ÀÌÇÏ
ABS 3§·/§¤ÀÌÇÏ 5§·/§¤ÀÌÇÏ 5§·/§¤ÀÌÇÏ
¢º Âü°í : À§ ¹èÃâÇã¿ë ±âÁØÀº 19899³â 8¿ù 9ÀϺÎÅÍÀÇ ±âÁØÀ¸·Î ÇÔ.
(5) ÀåÄ¡º° ¿ë·® ¹× ¼³°è±âÁØ(Ç׸ñº° ¸í½Ã) ÀåÄ¡¸í
  ¨ç ±â´É ¨è ±Ô°Ý ¨é ¼ö·® ¨ê ¿ë·® ¨ë ÀçÁú ¨ì À¯È¿¼ö½É ¨í À¯È¿¿ë·® ¨î ºÎ´ë½Ã¼³
(6) ¿¹»ó¿î¿µºñ(¹æÁö½Ã¼³)(Ç¥4 ÂüÁ¶)
<Ç¥4> ¿¹»ó¿î¿µºñ(¹æÁö½Ã¼³)
±¸ºÐ ¿ù°£¿î¿µºñ
Al©ü(SO©þ)©ý ¼Ò¸ð·®(§¸/§©) x Æó¼ö󸮷®(§©/ÀÏ) x ¾àǰºñ(¿ø/§¸) x °¡µ¿Àϼö/ÀÏ =
NaoH ¼Ò¸ð·®(§¸/§©) x Æó¼ö󸮷®(§©/ÀÏ) x ¾àǰºñ(¿ø/§¸) x °¡µ¿Àϼö/ÀÏ =
ÀÀÁýÁ¦ ¼Ò¸ð·®(§¸/§©) x Æó¼ö󸮷®(§©/ÀÏ) x ¾àǰºñ(¿ø/§¸) x °¡µ¿Àϼö/ÀÏ =
Àü±â »ç¿ë·®(§Ò/§©) x Æó¼ö󸮷®(§©/ÀÏ) x Àü±âºñ(¿ø/§Ò) x °¡µ¿Àϼö/ÀÏ =
ÇÕ°è ¿ø
   
(7) Æó¼ö󸮰èÅëµµ
(8) ±âŸµµ¸é
  ¢º ¹æÁö½Ã¼³ 󸮰èÅëµµ 1ºÎ
¢º Àüü ¹èÄ¡µµ, °Ç¹°, ¹èÃâ½Ã¼³, ¹æÁö½Ã¼³ µî
¢º »ç¾÷Àå À§Ä¡µµ(¾àµµ)
   
 
 

copyright© 2003. All right reseved.
18-3 Shinheung-dong, Dong-gu, Daejeon City Tel. (042)273-1297/ Fax.(042)271-1297